Description
Refurbished 150MM CVD AMAT P5000
Quantity: 1 set
Location: CA USA, SS1075
Valid: Subject to prior sale without notice. This is only for end users. Applicate your time.
Condition: Refurbished with OEM Specifications
Product info for your reference:
Refurbished 150MM CVD P5000
Mark II Mainframe
208VAC 50/60Hz
Dual SATA RAID hard drive
Compact flash floppy emulator
Flat Screen Monitors x2
8 slot storage elevator
Phase III robot
AMAT 0 Heat Exchanger
Remote AC frame with three (3) ENI OEM 12B 13.56Mhz generators
28 slot Gas Panel
Chamber A: Silane SiO2 PECVD Chamber
Standard chamber
SiO2 lid with single gradient feed thru
Throttle valve
Lamp module
Phase IV RF match
Manometer
MFC’s calibrated to customer specification
( Customer needs to specify the gas and flow range )
Chamber B: SiN PECVD Chamber
Standard chamber
SiN lid with single gradient feed thru
Throttle valve
Lamp module
Phase IV RF match
Manometer
MFC’s calibrated to customer specification
( Customer needs to specify the gas and flow range )
Chamber C: Blank
Chamber D: Blank
Installation onsite service is included.
Does Not Include:
Facilities installation such as electrical, facilities cooling water, vacuum and gas lines, exhaust, rigging, etc.
Option :
Refurbished QDP80 Pumps with AMAT Controller for P5000 x 3
P5000 REFURBISHMENT SCOPE OF WORK
The refurbished P5000 include these new parts:
Susceptor
Showerhead
Blocker
Etch quartz, silicon and other consumable parts
Pumping plate adapter
Heater window
Slit window
Endpoint window
Hybrid seal
Susceptor and lift bellows
Etch cathode bellows
Lamp bulbs
All o-rings and seals (Chemrez o-ring for etch and Kalrez for CVD chambers)
All hoses
New bellows in all rough and isolation valves
Shaft seals in the load locks
I/O slit valve o-ring
We perform complete rebuilds on the following parts:
CVD wafer and susceptor lifts
Robot
Lamp module
Gate valves
Throttle valves
Heat exchangers
Parts Refurbished by Outside Vendors:
RF matches
MFC’s, LFM’s and injectors
Manometers
Turbo pumps
Ozonators
Etch chambers, lids, liners, etc. anodization
Powder coating of panels and remote frames
Complete Tier 1 Mechanical testing includes:
Leak checking/ leak rates of all chambers to OEM specification
Wafer handling 500 wafers with no faults or warnings under typical process conditions
Strike N2 plasma in chambers
Heat/cool chambers to process temperatures
Complete test of all power supplies, matches, generators, modules etc.
The trademarks of the equipment and parts contained in this page belonged to the Original Equipment Manufacturers.
SS1075-SemiStar Purchase-